New build and construction electrical

Electrical for new builds, knockdown rebuilds, granny flats and major renovations across the St George area and the Sutherland Shire — rough-in through to fit-off.

Kitchen under construction with ceiling lighting installed before finishing
Rough-in done, lighting in, benchtop set — the stage where point placement is still easy to change.

Rough-in and fit-off

New build electrical happens in two visits, months apart. At rough-in the frame is up and the walls are open, and every cable in the house gets run — power, lighting, data, the lot. At fit-off, after the plaster and the painting, the points and fittings go on and the board is energised and tested.

The work that decides whether you are happy with the house is all in the first visit. Once the plasterboard goes on, moving a point stops being a small job.

Get the plan right before the walls close

This is where we earn our keep. Before rough-in we walk the plan with you and work out where things actually go, rather than where the standard layout puts them.

Thinking about an EV charger in five years is far cheaper than retrofitting one.

Granny flats and second dwellings

A secondary dwelling usually needs its own sub-main from the main switchboard, correctly sized, and sometimes its own board. We handle the supply side as well as the fit-out, and plenty of boards do not have the capacity without an upgrade first.

Electrician working from a ladder under a verandah frame against a brick wall
On site mid-build, working around the other trades.

Builders and owner-builders

We work directly with builders and with owner-builders. Either way you get the certificates you need, and we coordinate around the other trades rather than turning up when it suits us — rough-in has to happen between the framer and the plasterer, and missing that window holds everyone up.

Temporary builder's supply can be arranged where the site needs it.

Newly built kitchen with downlights on and the floor finished
Downlights and kitchen circuits finished on a new build, shortly before handover.
Electrician on a ladder working on a brick home under renovation
Mid-renovation. Walls open is the cheapest time to fix what is behind them.

Major renovations

A renovation that opens walls is effectively a partial new build, and it is the cheapest opportunity you will ever get to fix the wiring behind them. If the house is older, it is worth looking at what is in those walls while they are open.

Common questions

Do you handle new builds and renovations?

Yes — the whole run, from temporary builder’s supply and rough-in before the plaster goes on, through the switchboard, then power points, lighting, fans and final fit-off at the end. Knockdown rebuilds and granny flats as well.

When should I lock in the lighting plan?

Earlier than most people do. Moving a downlight on a drawing costs nothing; moving it after the ceiling is sheeted and painted means patching, repainting and a second visit. Before the plasterer starts is the moment to walk through the house and mark where everything actually goes.